The 2-Minute Rule for site acceptance test (sat)
A operation Check out is conducted in order that every one of the units and components in the site are performing appropriately. This will likely involve tests with the electrical process, calibration, HVAC technique, and fireplace basic safety process.Acceptance If the requirements are achieved, the program or device is accepted by the customer. I